www久草I婷婷久久网站I精品久久久影院I色婷婷免费视频I99视频精品视频高清免费I999久久a精品合区久久久I99爱精品在线

Welcome to the company's Web site!

Contact: Fiona Wang, +86 13869378860

new
center
news media

The correct way to use a melting crucible

2025-4-22

Crucible is one of the important equipment for alloy melting. It is a container for melting and refining metal liquids, as well as for solid-liquid heating and reaction. It is the foundation for producing high-quality castings.

Handling and storage of crucibles


Special handling tools must be used to transport crucibles, and crucibles cannot be rolled directly on the ground. During transportation, collision should be avoided to prevent damage to the glaze layer, which may affect the service life of the crucible.


The crucible must be stored in a dry and ventilated place, preferably on a wooden rack. Avoid placing the crucible directly on a brick, soil, or cement floor. Moisture can damage the glaze layer of the crucible, reducing its melting efficiency and service life. In severe cases, the bottom may even fall off.




Characteristics of silicon carbide graphite crucible


(1) Fast thermal conductivity: With high thermal conductivity, it can significantly shorten smelting time and cycle, saving energy;


(2) High strength: formed by isostatic pressing, with no defects in the internal structure and high physical strength;


(3) Antioxidant: Unique antioxidant design and use of high-purity raw materials to protect graphite, high antioxidant performance;


(4) Corrosion resistance: low porosity, special additives, effectively resist the chronic effects of molten materials such as slag removers;


(5) Long lifespan: Compared with ordinary graphite clay crucibles, the lifespan can be extended by 3-5 times.




Preparation work before installation


(1) Check whether the inner wall and bottom of the crucible furnace are intact and undamaged.


(2) Check if there is any residual slag in the furnace, and if so, remove it promptly.




Choose the correct crucible base


(1) The crucible base should have the same shape as the bottom of the crucible and be slightly larger in size (about 2CM).


(2) Suitable height crucible bases should be selected for different types of crucible furnaces.


(3) Avoid using discarded crucible bases, as this will greatly shorten the lifespan of the crucible.




Installation and fixation of crucible


(1) To install a crucible for gas or oil furnaces, first place the crucible on the base and reserve a certain amount of crucible expansion space between the crucible and the top of the furnace wall. Use materials such as wooden blocks and cardboard to fix it. Adjust the position of the burner and nozzle to align the flame with the combustion chamber, not directly with the bottom of the crucible;


(2) When installing a crucible for a rotary furnace, support bricks should be used to fix the crucible on both sides of the pouring nozzle, avoiding wedging the crucible tightly. At the same time, 3-4mm cardboard or other materials should be placed between the support bricks and the crucible as a pre expansion space for the crucible;


(3) The crucible for installing the resistance furnace should be placed in the central part of the furnace, with the bottom of the crucible higher than the bottom row of heating elements. At the same time, insulation cotton should be used to seal the top and between the crucibles.


(4) Install the crucible for the induction furnace to ensure that it is placed in the center of the induction coil to prevent local overheating and cracking of the crucible.




Preheating/First use of crucible


Preheating the crucible in the correct way can greatly extend its service life.


(1) According to different types of crucible furnaces, when using the crucible for the first time, preheat it to around 200 ℃ for 60-120 minutes without adding any materials, and dry it for 60 minutes. The purpose is to evaporate the water absorbed on the surface of the crucible. Prevent bursting during initial use.


(2) After preheating, the crucible should be heated to 800 ℃ (about 2 hours) as soon as possible, and kept warm for 20-30 minutes, then raised or lowered to the working temperature. The purpose is to quickly pass through the easily oxidizable temperature range of the graphite crucible.


(3) After the first preheating, the crucible usually does not need to be preheated again unless it becomes damp again.




New crucible and crucible cooled for a long time


Note that if the silicon carbide graphite crucible is not properly preheated, it is easily subjected to thermal stress impact. For large capacity furnaces and/or furnaces with high output burners, the following crucible preheating procedures must be followed to avoid damage to the crucible due to thermal shock;


(1) Slowly heat the empty crucible at a heating rate of 200 ℃ for 2 hours to remove moisture;


(2) Heat the crucible at a rate of 600 ℃ for 2 hours;


(3) Heat the crucible to 800 ℃ at the normal heating rate. The crucible used for aluminum insulation must be kept at 800 ℃ for about 30 to 40 minutes to fully utilize the glaze layer on the surface of the crucible.


(4) After the above steps, the crucible can be safely put into normal use. During use, it is also necessary to follow the crucible safety operating procedures.


  


After the first use and normal use of the crucible


(1) Load the furnace.


(2) Heat slowly with low power to 600 ℃. When the crucible is not used for a long time, it should be preheated at a heating rate of 2 hours to 200 ℃ and relevant operating rules should be followed.


(3) Heat the crucible to the specified temperature with full power,




The heating program depends on the frequency of furnace use, coil size, and the resistivity of the molten metal. The furnace design and crucible material determine whether an empty crucible can be preheated. If conditions permit, preheating the crucible would be better. Silicon carbide graphite crucibles are more susceptible to thermal shock and must be heated slowly.


Note: For tilting furnaces, the furnace top cover must be air dried with an electric induction or flame heater before starting to use the crucible.


For furnaces with frequencies above 1kHz:


(1) Suggest preheating the empty crucible. Heat the crucible at 20% of maximum power until it turns red hot.


(2) After 30 minutes, the heating power can be adjusted to 50% of the maximum power.


(3) Maintain 50% of the maximum power and add a metal block until the metal liquid fills half of the crucible volume.


(4) Increase power.


Be careful not to overheat the crucible. After the metal melts and fills the crucible, reduce the electrical power to avoid crucible corrosion.




For furnaces with frequencies below 1kHz:


(1) The heating efficiency of an empty crucible is relatively low, so it is necessary to put some metal blocks into the preheating crucible to improve the preheating effect.


(2) Heat the crucible at 20% of maximum power until it turns red hot.


(3) If the crucible powder turns red hot within half an hour, please heat the crucible at 50% of its maximum power.


(4) Keep heating at 50% of maximum power until the metal liquid fills half of the crucible volume before increasing the heating power




Feeding


(1) Metal materials must be dried before being added.


(2) When adding materials, they should be gently placed down and the metal ingot should not be thrown or poured into the crucible to avoid damaging it.


(3) Place the metal ingot vertically into the crucible, leaving sufficient expansion space between the ingot and the crucible wall. Do not place the metal ingot horizontally inside the crucible to prevent it from expanding and damaging the crucible after heating.


(4) You can first add some small pieces of metal material into the crucible as a cushion for large ingots.


(5) During continuous melting, a portion of the molten metal can be retained in the crucible to accelerate the melting rate. But it is necessary to avoid adding large pieces of metal material to a small amount of molten metal, in order to prevent the molten metal from rapidly cooling or solidifying and damaging the crucible.


(6) When adding liquid metal, avoid overfilling and generally do not exceed 80% of the crucible capacity.




The use of additives


When using additives, it is necessary to strictly follow the instructions for using the additives.


(1) Additives can only be added after the metal material has completely melted. Do not put additives in empty crucibles or solid metal materials, otherwise it will directly damage the crucible.


(2) When using additives, it is necessary to strictly follow the prescribed dosage, as excessive use of additives can greatly shorten the lifespan of the crucible.


主站蜘蛛池模板: 欧美视频在线观看一区二区 | 99成人 | 国产成人精品无码a区在线观看 | 欧美 日韩 国产 一区 | 中文字幕无码无码专区 | 亚洲欧美精品无码一区二区三区 | 美女91视频 | 日日夜夜拍拍 | 少妇粉嫩小泬白浆流出 | 国产999在线 | 人人天天夜夜 | 久久久999精品视频 日本高清不卡在线 | 精品视频一区二区三区免费 | 无码人妻精品一区二区三区久久久 | 天堂久久久久久中文字幕 | a毛片视频网站 | 欧美乱人伦中文字幕在线 | 人人爽人人爽人人片a | 天天爱夜夜做 | 青娱乐国产精品 | 涩涩97| 国产精品黑色丝袜高跟鞋 | 免费无码精品黄av电影 | 呦呦在线视频 | 一级色毛片 | 亚洲人在线视频 | www.avbobo| 性色av一区二区三区无码 | 国产三级在线播放 | 成a人v在线观看视频 | 人人妻人人玩人人澡人人爽 | 免费欧美黄色 | 香蕉久久久久久久av网站 | 天天做天天爱夜夜爽女人爽宅 | 毛葺葺老太做受视频 | 日韩人妻无码免费视频一区二区三区 | 狼人亚洲国内精品自在线 | 亚洲影视在线观看 | 亚洲六月丁香色婷婷综合久久 | 蜜芽国产尤物av尤物在线看 | 在线观看亚洲 | 嘿嘿视频不良网站 | 久久av无码精品人妻系列果冻传媒 | 91在线观| 亚洲国产三级在线观看 | 91伊人久久 | 国产精品爽爽久久久久久竹菊 | aaa在线 | 国产精品网址在线观看你懂的 | 免费一级片在线观看 | 精品女同一区二区三区免费播放 | 无码成人午夜在线观看 | 免费精品一区二区三区第35 | 日日爽视频 | 无套内射在线无码播放 | 欧美一级在线播放 | 国产精品爽爽va在线观看无码 | 亚洲国产片高清在线观看 | 60老熟女多次高潮露脸视频 | 偷拍小美女洗澡在线播放 | 日韩中文在线观看 | 欧洲成人全免费视频网站 | 波多野结衣 久久 | 欧美激情 在线 | 亚洲日韩中文字幕一区 | 伦理一区二区 | 国产精品人妻无码久久久2022 | 三级黄色免费观看 | 中文字幕日韩一区二区不卡 | 高大丰满熟妇丰满的大白屁股 | 国产精品久久久久久久午夜 | 精品一区二区在线观看视频 | 天天爽夜夜爽人人爽 | 亚洲精品无码永久中文字幕 | 欧美综合成人网 | 九九激情网| 在办公室被c到呻吟的动态图 | 亚洲日韩中文字幕在线播放 | 国产精品a在线观看香蕉 | 伊人狠狠| 日本成熟老妇乱 | 亚洲精品国产第一综合99久久 | 久久免费看少妇高潮A片JA | 人妻换着玩又刺激又爽 | 久久久久无码国产精品一区 | 亚洲一区无码中文字幕 | 永久免费无码网站在线观看 | 日韩精品毛片无码一区到三区 | 欧美日韩中文在线视频 | av国产精品| 操一操 | 一道本不卡视频 | 久草日b视频一二三区 | 免费在线国产视频 | 日韩av午夜在线观看 | 中文字幕av一区 | 久久久久久久极品内射 | 国产精品视频成人 | 日韩人妻精品一区二区三区视频 |